Client: Moosehead Breweries

Home
Moosehead Breweries Expansion fit up

This facility is located on Pier 10 at the Port of Saint John and is a new industrial auto shredder that has the capability of processing up to 250,000 metric tons of scrap metal per year, the site consists of a new high voltage switch yard, high voltage distribution system, the shredder facility as well as a maintenance building.

  • High Voltage switchyard
  • High Voltage switchgear
  • Distribution system
  • Building services (lighting, receptacles, heat, etc.)
  • PLC controls
  • Motor Control Centre
  • Camera system
  • Fire Alarm System
  • Communication System
  • Conveyor Systems
  • Cable Tray System